Design the centre

A Centre has been designed and its cost evaluated.

A Centre has been designed and its cost evaluated.

For the time being building the centre has been postponed.

For a general summary of the discussions in 2006 + 07 visit www.antjeziegler.de "discussions 2006 + 07"

0